URBANEXPRESSLIVEURBANEXPRESSLIVEURBANEXPRESSLIVE
  • Home
  • Politics
    Politics
    “Followers who tell the truth, and leaders who listen to it, are an unbeatable combination.”— Warren Bennis
    Show More
    Top News
    Allegation of Police Attempt Carting Election Material, Gov Fubara Storms RSIEC
    October 4, 2024
    Akpabio’s Removal Imminent As There’s Plan Gang-up Against Him-Primate Ayodele
    October 12, 2024
    Quick Restoration of Power In Northwest; Northern Senators Advocate Swift Response
    October 26, 2024
    Latest News
    His Age of Prosperity Ideology Yet To Reach Nigerian Workers- Ajaero On President Tinubu
    October 5, 2026
    President Tinubu Departs Paris For Nigeria 
    September 29, 2026
    Adeyanju: INEC Should Comply With Supreme Court Judgment 
    September 28, 2026
    Never In Our State- What NDC State Chair Remark After Wike’s Angle Stopping Peter Obi From Winning Rivers Surfaced; See Footage
    September 24, 2026
  • Entertainment
  • Urban & Rural Lifestyle
  • Column
  • Environment
  • Urban Sports
  • Crime Lence
  • More Links
    • Contact us
    • Advertise
Search
  • Advertise
© 2024 Urbanexpresslive. All Rights Reserved.
Reading: Closure of First Niger Bridge Repair: FG Announces Two-Week Closure
Share
Notification Show More
Font ResizerAa
URBANEXPRESSLIVEURBANEXPRESSLIVE
Font ResizerAa
  • Home
  • Politics
  • Entertainment
  • Urban & Rural Lifestyle
  • Column
  • Environment
  • Urban Sports
  • Crime Lence
  • More Links
Search
  • Home
  • Politics
  • Entertainment
  • Urban & Rural Lifestyle
  • Column
  • Environment
  • Urban Sports
  • Crime Lence
  • More Links
    • Contact us
    • Advertise
Follow US
  • Advertise
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
URBANEXPRESSLIVE > web-Page > Politics > Closure of First Niger Bridge Repair: FG Announces Two-Week Closure
PoliticsUrban & Rural Lifestyle

Closure of First Niger Bridge Repair: FG Announces Two-Week Closure

urbanexpresslive
Last updated: September 4, 2026 10:51 am
urbanexpresslive
Share
3 Min Read
SHARE

Olusegun ARIYO

Contents
The Federal Ministry of Works, Anambra State Field Headquarters, has officially announced the closure of the First Niger Bridge in Onitsha to commence repair works.The closure comes after last week’s visit by the Minister of Works, Dave Umahi, who inspected a vandalised section of the bridge, where bolts and iron rods had been stolen by scavengers.An official press release by the ministry’s field office in Anambra, signed by the State Controller, Mr Timothy Emenike, noted that the bridge would be closed for two weeks, starting Monday, 7 September 2026.The release reads: “The attention of the general public, motorists and other road users is hereby drawn to the deteriorated condition of the First Niger Bridge, Onitsha, particularly the carriageway surface and certain bridge components affected by vandalism, including portions of the expansion joint steelworks and stanchion/steel truss nuts and bolts.“During his recent working visit to Anambra State, the Minister of Works, David Nweze Umahi, expressed concern over the condition of the bridge and directed the immediate commencement of emergency maintenance and rehabilitation works to restore the facility to a safe and properly motorable condition.“Accordingly, Messrs SKECC, the contractor handling the Km 0+000 to Km 20+000 section of the Onitsha-Enugu Dual Carriageway, has been directed to immediately commence emergency maintenance works on the First Niger Bridge.“The First Niger Bridge will be fully closed to traffic from Monday, 7” September 2026, and the emergency maintenance works are expected to be completed by Monday, 21st September 2026. In view of the nature and urgency of the intervention, motorists and other road users are hereby advised and directed to use the Second Niger Bridge route through Obosi towards Asaba, Delta State and other destinations beyond, throughout the closure period.“Appropriate traffic diversion arrangements, road signs, safety barriers, traffic-control personnel and other necessary safety measures will be deployed to guide motorists and ensure the safety of road users, construction personnel and other members of the public.“Motorists are strongly advised to obey all temporary traffic signs and diversion instructions, approach the construction and diversion zones with caution, reduce speed and avoid reckless overtaking.”The ministry said part of the work to be done on the bridge includes milling and removal of the existing deteriorated asphalt surfacing, laying of approximately 40mm asphalt wearing course and necessary associated maintenance and safety works on the bridge.Also, the maintenance will include the installation of solar-powered streetlights and closed-circuit television, CCTV) cameras to monitor the activities of vandals on the bridge, and the installation and deployment of appropriate traffic-control and diversion measures to ensure safety, smooth driving and significantly reduce the traffic difficulties currently experienced around the First Niger Bridge axis.

The Federal Ministry of Works, Anambra State Field Headquarters, has officially announced the closure of the First Niger Bridge in Onitsha to commence repair works.

The closure comes after last week’s visit by the Minister of Works, Dave Umahi, who inspected a vandalised section of the bridge, where bolts and iron rods had been stolen by scavengers.

An official press release by the ministry’s field office in Anambra, signed by the State Controller, Mr Timothy Emenike, noted that the bridge would be closed for two weeks, starting Monday, 7 September 2026.

The release reads: “The attention of the general public, motorists and other road users is hereby drawn to the deteriorated condition of the First Niger Bridge, Onitsha, particularly the carriageway surface and certain bridge components affected by vandalism, including portions of the expansion joint steelworks and stanchion/steel truss nuts and bolts.

“During his recent working visit to Anambra State, the Minister of Works, David Nweze Umahi, expressed concern over the condition of the bridge and directed the immediate commencement of emergency maintenance and rehabilitation works to restore the facility to a safe and properly motorable condition.

“Accordingly, Messrs SKECC, the contractor handling the Km 0+000 to Km 20+000 section of the Onitsha-Enugu Dual Carriageway, has been directed to immediately commence emergency maintenance works on the First Niger Bridge.

“The First Niger Bridge will be fully closed to traffic from Monday, 7” September 2026, and the emergency maintenance works are expected to be completed by Monday, 21st September 2026. In view of the nature and urgency of the intervention, motorists and other road users are hereby advised and directed to use the Second Niger Bridge route through Obosi towards Asaba, Delta State and other destinations beyond, throughout the closure period.

“Appropriate traffic diversion arrangements, road signs, safety barriers, traffic-control personnel and other necessary safety measures will be deployed to guide motorists and ensure the safety of road users, construction personnel and other members of the public.

“Motorists are strongly advised to obey all temporary traffic signs and diversion instructions, approach the construction and diversion zones with caution, reduce speed and avoid reckless overtaking.”

The ministry said part of the work to be done on the bridge includes milling and removal of the existing deteriorated asphalt surfacing, laying of approximately 40mm asphalt wearing course and necessary associated maintenance and safety works on the bridge.

Also, the maintenance will include the installation of solar-powered streetlights and closed-circuit television, CCTV) cameras to monitor the activities of vandals on the bridge, and the installation and deployment of appropriate traffic-control and diversion measures to ensure safety, smooth driving and significantly reduce the traffic difficulties currently experienced around the First Niger Bridge axis.

You Might Also Like

Okpebholo Sworn In, Takes Over From Obaseki As Edo Governor

How Minister of State For Petroleum, Heineken Lokpobiri Was Suspended From Party

Sallah: Tinubu’s Eid-el-Kabir Message to Nigerians

How Georgia Judge Shoots Self, Dies In Courtroom

2027:  Presidency Fumes over Jonathan’s Rumoured Ambition, Says ‘’Court Will Decide

Sign Up For Daily Newsletter

Be keep up! Get the latest breaking news delivered straight to your inbox.
[mc4wp_form]
By signing up, you agree to our Terms of Use and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Twitter Copy Link Print
Share
Previous Article Transfer: How Femi Azeez Completes Move To Brighton 
Next Article EPL: What Lampard Revealed Regardingb Conventr Facing Arsenal and Man City After Defeat 
Leave a comment Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

235.3kFollowersLike
69.1kFollowersFollow
11.6kFollowersPin
56.4kFollowersFollow
136kSubscribersSubscribe
4.4kFollowersFollow
- Advertisement -
Ad imageAd image

Latest News

WHEN VICTORY IN COURT IS NOT ENOUGH: THE PLIGHT OF REINSTATED CADET ASP COURSES 18, 19 AND 20
Crime Lence Crime Reports October 11, 2026
Accepting Any Child Means DNA Test Will Be Carried Out as Determinant- Singer Mayorkun
Uncategorized October 5, 2026
No Yabbin Again -Cubana Chief Priest Show-off Weight-Loss Transformation
Entertainment October 5, 2026
His Age of Prosperity Ideology Yet To Reach Nigerian Workers- Ajaero On President Tinubu
Discover Politics October 5, 2026
//

UrbanExpressNews is Nigeria Most Reliable Online News, With Quality Pedigree of Writers made available on the online space.

Download Our App

Sign Up for Our Newsletter

Subscribe to our newsletter to get our newest articles instantly!

info@urbanexpresslive.com

 

Follow US
© 2024 Urbanexpresslive. All Rights Reserved.
Welcome Back!

Sign in to your account